Camp Commissioning | Pan-India | 5,000 Personnel Capacity
From Bare Land to a Fully Operational Industrial Camp — In Your Timeline
Singhal Group delivers end-to-end camp commissioning and management for oil & gas, renewable energy, and infrastructure projects — compliant, functional, and ready for immediate occupancy.
5,000+ Personnel Capacity | HSE Compliant Operations | Complete Turnkey Delivery | Active Contracts with Adani, Vedanta, OIL
A project camp is not an afterthought — it is operational infrastructure as critical as the project itself. Poor accommodation, unreliable utilities, inadequate catering, or non-compliant HSE standards at a camp directly translate to workforce inefficiency, high attrition, regulatory penalties, and project delays.
Singhal Group’s camp commissioning and management service eliminates this risk. We plan, build, commission, and manage the complete camp ecosystem — from boundary fencing and road construction to bunkhouse placement, electrical distribution, water supply, waste management, catering kitchens, and security — delivering a camp that is fully functional, HSE compliant, and ready for occupancy from day one.
Our experience spans decades of camp deployments across India’s most demanding environments: the oil fields of Barmer and Jaisalmer in Rajasthan’s western desert, Adani’s Khavda mega renewable energy project in Gujarat’s Rann of Kutch, and Oil India Limited’s drilling operations in the forests of Tripura. Each of these environments presented unique logistical, climatic, and regulatory challenges that Singhal Group navigated successfully.
The result: consistently on-time camp commissioning, zero major HSE incidents, and repeat contract awards from India’s largest industrial clients.
Whether you need a 50-person supervisor camp established in 10 days, or a 2,000-person full-service base camp commissioned over six weeks, Singhal Group has the manpower, assets, and project management capability to deliver it.
Scope of Camp Commissioning Services
Phase 1 — Site Preparation & Infrastructure
- Site survey, ground levelling, and compaction
- Internal road construction and surface preparation
- Boundary fencing and security gate installation
- Drainage and stormwater management
- Foundation preparation for bunkhouse placement
Phase 2 — Accommodation Installation
- Bunkhouse transportation and crane placement
- Skid installation and levelling
- Senior management cabins (single and double occupancy)
- Worker bunkhouses (2, 4, 6, 8-man)
- Dedicated toilet and bathroom blocks
- Recreation facilities and common areas
Phase 3 — Utilities & Services
- Electrical distribution network installation (LT panels, cabling, lighting)
- DG set installation and power commissioning
- Water supply system (storage, distribution, hot water)
- Sewage and waste management systems
- Communications and IT infrastructure
Phase 4 — Support Facilities
- Kitchen and dining hall setup
- Dry store and refrigerated cold store
- Medical/first aid room
- Security post and CCTV
- Offices and conference rooms
- Fuel storage and pump room
Phase 5 — HSE Compliance & Commissioning
- Full HSE audit and documentation
- Emergency response plan and assembly point designation
- Fire safety equipment installation and testing
- Electrical safety testing (ELCB, earthing)
- Water quality testing
- Formal commissioning inspection and client sign-off
Ongoing Camp Management Services
- Housekeeping and maintenance
- Catering (Indian, continental, Chinese, non-vegetarian)
- Water supply and waste management operations
- Electrical and mechanical maintenance
- Security management
- Inventory and logistics management
- Periodic HSE audits and compliance reporting
Key Benefits
- Single Point of Accountability — One contractor responsible for every element of camp establishment and management, eliminating inter-contractor disputes and accountability gaps
- 5,000 Personnel Capacity — Proven capability to commission and manage camps for projects of any scale, from small drilling crews to large construction workforces
- HSE Compliance by Design — All camp layouts, utility systems, and operating procedures designed to meet client HSE requirements (Cairn, Vedanta, Adani, OIL standard frameworks)
- Owned Assets — 800+ bunkhouses, 89 power units, water and vacuum tankers, transport fleet — no dependency on subcontractors for core camp assets
- Experienced Project Management — In-house engineers, supervisors, electricians, plumbers, and camp managers with extensive remote site experience
- Rapid Mobilisation — Established logistics chains from Barmer base depot to project sites across India; prioritised fleet dispatch for urgent camp requirements
Our Process
- Site Briefing & Assessment — Client provides project location, personnel count, accommodation breakdown, and HSE standards; Singhal Group conducts site survey
- Camp Design & Planning — Camp layout, bunkhouse specification, utility plan, HSE plan, and cost estimate prepared and submitted
- Procurement & Manufacturing — Bunkhouses confirmed from fleet or manufactured; utilities equipment, furniture, and materials procured
- Site Preparation — Ground works, roads, fencing, and foundation preparation executed
- Installation & Commissioning — Bunkhouse placement, utilities installation, testing, and commissioning
- HSE Handover — Formal inspection, documentation, fire safety verification, and client sign-off
- Ongoing Operations — Full camp management, catering, maintenance, and monthly HSE reporting for project duration
- Demobilisation — Orderly camp removal, site clearance, and equipment repatriation
Industries Served
Oil & Gas Drilling, Exploration & Production | Renewable Energy Construction | Civil Infrastructure (Roads, Bridges) | EPC Contractors | Mining | Defence | Government & PSU